North End from inside. Office and class rooms will be to the left.
North End with studs and backer board
North End taking shape with block and windows. Opening left for concrete trucks to pour floor
North End will block completed
Drive thru side roof from inside
Drive thru cover and finished side
Bathroom rough ins and notice size of truck compared to building
Post Office side entrance frame from inside. Again notice size of truck.
Post Office side entrance before block
Post Office side entrance completed. Pastor Mike was on site that day.
Kitchen door and window on the right. The door on the left is one of the main entrance doors on the Post Office side.
Completed Post Office Side. The steeple will go over this entrance. Part of the roof is still to be completed before the steeple can be installed. The steeple is on site
This a Grand View of the Post Office Side. The crane is being used to install the roof on the backside.