North End as they start to close in wall
|
North End from inside. Office and class rooms will be to the left.
|
North End with studs and backer board
|
North End taking shape with block and windows. Opening left for concrete trucks to pour floor
|
North End will block completed
|
Drive thru side roof from inside
|
Drive thru cover and finished side
|
Bathroom rough ins and notice size of truck compared to building
|
Post Office side entrance frame from inside. Again notice size of truck.
|
Post Office side entrance before block
|
Post Office side entrance completed. Pastor Mike was on site that day.
|
Kitchen door and window on the right. The door on the left is one of the main entrance doors on the Post Office side.
|
Completed Post Office Side. The steeple will go over this entrance. Part of the roof is still to be completed before the steeple can be installed. The steeple is on site
|
This a Grand View of the Post Office Side. The crane is being used to install the roof on the backside.
|